What problems should we pay attention to when transporting electric wires and cables?

      release:admin Browse:4422 times

      Wire and cable products need to go through a certain process of transportation and storage from the factory to delivery to the user. During this period, they need to go through many times of handling, loading, unloading and storage. Some wire and cable factory is good, but to the hands of customers, the cable appearance has been damaged, some wire and cable insulation has been damaged, these problems occur from time to time, should cause everyone's attention. Commonly used wire and cable into a circle or on the plate for the packing and shipping, in transport, the problem should be paid attention to the following aspects: 1, wire and cable transportation before should first check whether the cable packing is in good condition, cable certificate whether fill in the specification, the cable end head is tightly, and firmly fixed on the cable, cable tray lateral plate are loose and fall off wait for a phenomenon, after confirmed no problem, can transport. 2, wire and cable tray should be generally used forklift or crane, loading and unloading cable tray, it is strictly prohibited to lift several cables at the same time, because such lifting, several cables force uneven, unstable center of gravity, prone to slip and fall. 3. The cable tray is not allowed to be loaded, unloaded or stored on the flat side, because the flat side will loosen the cable winding and affect the normal wiring of the cable, and the flat side may also damage the cable and cable tray. 4, in vehicles, ships and other means of transport, cable tray should be crisscrossingly arranged, cable tray must be placed firmly, both sides of the wire rope firmly fixed in the vehicle, and at the bottom of the cable tray with triangular wedge plug, prevent the cable tray shaking, collision or overturned during transport. 5, cable rolling on the ground must be according to the direction indicated by an arrow on the scroll on the side of the cable, if the direction of rolling, will make the cable unwinding and loose, not when the cable protection plate rolling, highlight the outermost layers on both sides of the plate must be the cable more than 10 cm, can prevent hard objects when rolling pressure below the cable, so as not to damage the cable. Cable tray rolling should be controlled in a small range, long distance movement must be used forklift or crane and other special equipment. 6, cable car, it is strictly prohibited to cable directly push from the transport vehicle, the large cable hoisting machinery or tripod to manual gourd, smaller cable (or plate) only a small amount of cable can into slope wood planks, with a rope or control of the winch cable, slowly down along the slope, prevent cable rolling when subjected to mechanical damage. 7. For important engineering cables or export cables, protective plates should be nailed to the cable tray for opening. The protective plates should be tightly packed and fixed. 8. When the cable is mounted, the end shall be sealed reliably. Protective cover (cap) shall be added to the cable end extending out of the disk. 9, large cable tray transport, should pay attention to the choice of road transport equipment, if the use of truck transport, should pay attention to the height of the car should conform to the traffic road bridge, culvert and other height restrictions, if exceed the limit, can use a special trailer, in order to reduce the height of transport. 10. Do not throw the coil loaded wires and cables when they are moved. Handle and put them gently in transportation to avoid mechanical damage. Loop flexible line can be stowed or transported in the container, stacking height should not be too high, stacking between close contact or good fixed measures, in order to prevent stacking collapse, damage cables. After the cable is transported to the destination, it should be checked in time to see if there is any cable damage. If there is any cable damage, it should contact the manufacturer immediately and be solved by the manufacturer. The damaged cable should not be put into use to prevent adverse consequences.

      主站蜘蛛池模板: 中文字幕av无码专区第一页| 国产成人99久久亚洲综合精品| 亚洲成人网在线播放| 青娱乐国产在线| 大学寝室沈樵无删减| 久99久热只有精品国产男同| 欧美多人换爱交换乱理伦片| 国产亚洲综合久久| 99精品国产在热久久| 日本高清xxxxx| 亚洲欧美日韩国产一区图片| 给我看播放片免费高清| 国产成人精品一区二三区在线观看| 一区二区三区四区欧美| 日本精品一区二区三本中文| 亚洲国产精品乱码在线观看97| 美女黄频视频大全免费的| 国产日产欧产精品精品电影| 99久久国产综合精品swag| 成人国产精品一区二区视频| 久久综合伊人77777| 男女下面无遮挡一进一出| 国产乱子伦露脸在线| 777精品视频| 天天干天天摸天天操| 中文在线最新版天堂| 日韩中文有码高清| 亚洲自偷精品视频自拍| 羞羞漫画登录页面免费| 国产天堂亚洲精品| 三上悠亚一区二区观看| 夜爽爽爽爽爽影院| 三上悠亚国产精品一区| 日本在线视频www色| 亚洲人成人一区二区三区| 波多野结衣中文字幕在线视频| 国产不卡视频在线观看| 黄色片免费网站| 在线观看视频免费国语| 一级一级女人18毛片| 无码熟妇αⅴ人妻又粗又大|